米乐M6官网首页_米乐m6苹果下载_登陆平台

米乐M6官网首页
Enterprise performance
Bombardier Phase I Project of Tianjin Airport Economic Zone
Time:2020-06-28

The project includes two separate buildings: No. 1 maintenance hangar and No. 2 power station. The roof structure adopts the primary and secondary truss system. The maximum span of the main truss system is 88m, which provides ample space for the repair and maintenance of each series of Bombardier business aircraft.

  • 米乐M6官网首页
  • 米乐M6官网首页
  • 米乐M6官网首页
  • 米乐M6官网首页
  • 米乐M6官网首页
  • 米乐M6官网首页
  • Baidu
    sogou