米乐M6官网首页_米乐m6苹果下载_登陆平台

米乐M6官网首页
Enterprise performance
Tianjin Dongli Sports Center
Time:2020-06-28

The construction area is 23153m, with a special-shaped pipe truss structure. The main truss span is 150m, and the maximum height of the building is 28m.

  • 米乐M6官网首页
  • 米乐M6官网首页
  • 米乐M6官网首页
  • Baidu
    sogou